Six Core Engines.
One Engineering Foundation.
Explore IYABOKO’s computational systems, evidence workflows, governance functions and pathways toward physical engineering. We organise complex technical work around clear requirements, documented assumptions and responsible human decisions.
Six specialised engines. Clearly defined functions.
The IYABOKO architecture joins computation, technical intelligence, assurance, continuity, governance and evidence tracking. Individual capabilities must be verified within their applicable release and scope.
C3
Scientific modelling, numerical calculation, bounded simulation and reproducible analysis.
- Calculation context and assumptions
- Research simulation outputs
- Transparent modelling constraints
CoreINTEL
Requirements and technical project context organised to support engineering evaluation and documented human decisions.
- Requirements-to-evidence mapping
- Alternative and constraint tracking
- Reviewable project context
Sentinel
Technical-readiness checks, evidence-gap identification and organised remediation preparation.
- Finding and risk registers
- Review of stated controls
- Qualified acceptance checkpoints
DCC
Continuity plans, dependency analysis and evidence of restoration procedures for scoped systems.
- Recovery prerequisites
- Backup evidence planning
- Controlled restoration review
SACG / ICAF
Defined permissions, accountability boundaries and explicit human-approval pathways.
- Role and scope definitions
- Authorisation records
- Simulation versus operation boundaries
ProofChain
Provenance relationships, integrity checks and audit-oriented evidence preparation.
- Source and transformation records
- Integrity verification
- Reviewer-ready documentation
From requirements to traceable review.
The six engines describe a proposed coordinated workflow. Data availability, model validity, backend permissions and qualification must be confirmed for each project.
CoreINTEL
Set scope, requirements and sources.
C3
Define and test bounded models.
Sentinel
Review evidence, gaps and risks.
DCC
Document continuity provisions.
SACG / ICAF
Request accountable human approval.
ProofChain
Record provenance and outcomes.
Research platforms and products. Readiness matters.
Distinct technology families can support modelling, evidence analysis, industrial research and future space-engineering studies. Public descriptions are not production certification.
BOKOMUTO
Research-oriented digital and physical engineering workbenches for modular study, calculation and review.
Research / Controlled Evaluation BOKOMUTO Overview →ProofChain
Digital records and integrity methods supporting inspection of technical sources, changes and transformations.
Release Status Varies Evidence Index →G64 Industry Suite
Read-only research workflows for nuclear suppliers, renewable energy, mining, non-clinical biotechnology and quantum laboratories.
Research and Evaluation Industry Applications →Iyaboko Spaceflight Core OS
Requirements and ground-based simulation research, evidence preparation and safe-mode studies.
Non-Operational / No Flight Authority Space Engineering →SpaceOS & IOSTS
Astronomical data exploration, space-system studies and proposed transport research concepts.
Research Concepts Space Research →Digital Workspaces
Account-gated digital resources may be offered after the applicable authentication, subscription and application permissions have been verified.
Access Subject to Verification Workspace Status →A pathway from digital models to physical evidence.
IYABOKO’s hardware direction is research-led: architecture, instrumentation, interface definition, bench testing and evidence preparation. Physical construction and safety qualification are separate responsibilities.
Prototype studies and modular systems
The relationship between software assumptions and observed physical behaviour must be demonstrated, not inferred from visualisation or simulation alone.
Embedded and Instrumentation Studies
Define sensor interfaces, telemetry constraints and test responsibilities before connecting devices.
Ground-Test and HIL Preparation
Develop bounded hardware-in-the-loop requirements and safety plans when appropriate.
Independent Physical Acceptance
Electrical safety, calibration, environmental testing and regulatory approvals require appropriate specialist review.
Technical credibility requires independent evidence.
Controls are specified as engineering goals and review activities, not guaranteed performance or blanket certification.
Reproducibility
Record methods, environments, test cases and results.
Cybersecurity
Review access control, validation, logging and recovery requirements.
Human Authority
Separate research observations from permission to deploy.
Evidence Status
Publish results and limitations with clear provenance.
Technology access matched to project scope.
Explore public product information, review your existing member account or request project-based engineering and licensing discussions. Access to protected services depends on verified availability and permission.
Membership Information
Review membership categories and their current availability. Subscription payment and product activation require verified production systems.
View Membership Status →Account & Client Portal
Review account information and the status of planned customer workspaces. Account creation alone does not grant technical product access.
Member Account →Scoped Technical Engagement
Discuss specialised engineering, controlled pilots or research collaboration under written agreement.
Consultation →Technology becomes valuable when the evidence is clear.
Describe the engineering challenge, available datasets, constraints and intended outcomes. We can explore an appropriate scoped technical or research pathway, subject to capacity and written terms.